Radiant floor tiubing going down
The HVAC guys are laying the radiant tubes in the lower level. It looks like we are getting close to finishing soon, and hopefully we will have the slab poured sometime this week.
Here is the inspector checking out the tubes. The 12" on center underneath the stairs

Tubes in Hailes room and the bathroom. It's coming along with just a little bit left.

This is the master bedroom...

The little remaining portion... Rec room and laundry room..
Here is the inspector checking out the tubes. The 12" on center underneath the stairs

Tubes in Hailes room and the bathroom. It's coming along with just a little bit left.

This is the master bedroom...

The little remaining portion... Rec room and laundry room..