An update for the pool is in progress.... Based on the house build this is like being on Mac 8... We are flying through the process.... The rough plumbing is complete and here is where the equipment is going
There will be a change from the original plan based on the feedback of our pool builders Mike and Doug. There will be one sheer descent on the shallow side for kids entertainment and two spaced equally on the long side. Maybe it would be better to have three???
This is the view of the pool from the house... I think we need to incorporate a pergola or something on the other side of the pool??
The steel is in place... Here is one of the corners with the seat shelf which will be along the whole side.
Overall the whole pool looks pretty good. I am wondering whether we really need #4 steel everywhere but everyone assures me this is per requirements and no need for it.
Another look of one of the corners on the shallow end..
I know this is a lot of pics for a pool build but based on what I have witnessed it seems to be a well orchestrated process with each piece knowing exactly what is required and doing no more than whats necessary...
Lets hope that efficiency will result in a pool that will last a life time...