but we are still waiting for inspections to complete framing and roughin.
The outside stair have 4 piers because of the 12 foot span. the support piers are poured on the virgin dirt and alsi supported all the way around.
The last of the back fill before the steps are formed and the concrete is poured.
These are the lastest interior stairs. We decided to use Brazillian Cherry for the flooring and thus also had the stairs made from B C.
No comments:
Post a Comment